[2024] Easy To Download C_TS422_2021 Actual Exam Dumps Resources [Q49-Q70]

Share

[2024] Easy To Download C_TS422_2021 Actual Exam Dumps Resources

Uplift Your C_TS422_2021 Exam Marks With The Help of C_TS422_2021 Dumps


SAP C_TS422_2021 certification exam covers a wide range of topics related to production planning and manufacturing, including production orders, master data, bills of material (BOMs), work centers, capacity planning, and shop floor control. C_TS422_2021 exam also evaluates candidates' knowledge of production planning and execution processes, including demand management, material requirements planning (MRP), production scheduling, and confirmations.

 

NEW QUESTION # 49
What detremines whatherthe planned independent requirements in MRP are consumed by other requrements?

  • A. Requirements type
  • B. Requirements profile
  • C. Consumption sequence procedure
  • D. Order type

Answer: A


NEW QUESTION # 50
What does it mean for the production planner when MRP works with infinite capacities?

  • A. MRP creates capacity requirements without checking the capacity of a work center.
  • B. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
  • C. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
  • D. MRP creates capacity requirements only if the work center has sufficient capacity.

Answer: A


NEW QUESTION # 51
How can you achive a feasible production plan in case of capacity constraints?

  • A. Reduce the planning window
  • B. Execute an infinite production planning run
  • C. Select an alternative mode on a resource.
  • D. Adjust the available capacity.
  • E. Form optimum sequence to reduce setup times

Answer: C,D,E


NEW QUESTION # 52
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?

  • A. When multiple operations are maintained for one product
  • B. When multiple planned orders exist on one resource
  • C. When alternate resources are used within one operation
  • D. When multiple production versions are maintained for one product

Answer: C


NEW QUESTION # 53
What is the purpose of a reporting point confirmation in repetitive manufacturing?

  • A. To reduce the total production lead time for along production line
  • B. To stage different components for a production line simultaneously
  • C. To provide timely updates of inventory management for the staged components
  • D. To determine the work in progress along the production line

Answer: C,D


NEW QUESTION # 54
What is the purpose of collective orders?

  • A. To post any component withdrawal as single backflush with order confiramtion
  • B. To post production costs on a cost collector instead of the production order
  • C. To manage production orders for an entire finished product on multiple levels
  • D. To combine order management of co-products any by-products with the main product.

Answer: C


NEW QUESTION # 55
You are working with planning strategy 40 (Planning-with-final assembly) When does consuption of planned independent requirements take places?

  • A. When the MRP result are saved
  • B. When you deliver a sales order
  • C. When you create a sales order
  • D. When you create a planned order

Answer: C


NEW QUESTION # 56
What are some uses for the low-level code assigned to each material?

  • A. It is used by product costing to determine how coast are rolled up.
  • B. It is used by engineering to indentify subitems in an engineering bill of material (BOM).
  • C. It is used in MRP to determine the sequence in which materials are planned.
  • D. it is used by ATP to determine the priority of alternative components.

Answer: A,C


NEW QUESTION # 57
For a production version to be valid and consistent what requirements must be fulfilled?

  • A. The lot size range must be within the lot-size range of the assigned routing.
  • B. The deletion flag must NOT be set for the bill of materials (BOM) or the routing.
  • C. The assigned routing must NOT have alternative sequences.
  • D. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
  • E. The assigned routing must be a rate routing.

Answer: A,B,D


NEW QUESTION # 58
During production order creation, several valid production versions are found. How does the system choose the production version?

  • A. Lot size or material cost
  • B. Planned order or material number
  • C. Alphanumeric or quota arrangement
  • D. Valid period or sale order

Answer: C


NEW QUESTION # 59
How can you set up the supply source for the Kanban process in SAP S/4HANA?

  • A. Using purchasing costs for automated source prioritization
  • B. Using stock transfer reservations for stock transfer
  • C. Using run schedule quantities for in-house production
  • D. Using quotations for internal and external procurement
  • E. Using purchase orders for external procurement

Answer: B,C,E


NEW QUESTION # 60
Which item statuses can you select inside a material BOM?

  • A. Service
  • B. Sales
  • C. Quality management
  • D. Engineering

Answer: B,D


NEW QUESTION # 61
What does forecasting in demand planning cycle include?

  • A. Past quotation quantities
  • B. Market intelligence
  • C. Past sales order quantites
  • D. Past procurment quantities
  • E. One-off events

Answer: B,C,E


NEW QUESTION # 62
Which chart types does the tabular planning table provide in SAP S/4HANA

  • A. Order (dispatched) chart
  • B. Capacity requirements chart
  • C. Order (pool) chart
  • D. Work center capacities chart

Answer: B,D


NEW QUESTION # 63
Which of the following are possible configuration steps when setting up the alert monitor in Advance Planning?

  • A. Assign the alert profile to the overall profile.
  • B. Create object selection variant for product-related alerts.
  • C. Create object selection variant for transportation lane-related alerts.
  • D. Assign the overall profile to the authorization profile.

Answer: A,B


NEW QUESTION # 64
You set up a material as a phantom assembly by entering the special procurement key in the material master.
How can you switch off the phantom assembly in a specific bill of material (BOM)?

  • A. Change the phantom item indicator for the phantom assembly in the BOM.
  • B. Change the explosion type of the phantom assembly in the BOM.
  • C. Change the item category of the phantom assembly in the BOM.
  • D. Change the special procurement key of the phantom assembly in the BOM.

Answer: B


NEW QUESTION # 65
Which of the following is valid sequence of the main activities in production order processing?

  • A. Creation, release, printing, goods issue, confirmation, goods receipt
  • B. Creation, availability check, release, material widrawal, confirmation
  • C. Creation, printing, release, goods issue, confirmation, goods receipt
  • D. Creation, release, settlement, goods issue, confirmation, goods receipt

Answer: A,B


NEW QUESTION # 66
You want to schedule an operation finitely, without moving other operations. Which scheduing strategy do you select?

  • A. Insert operation
  • B. Schedule in working time only
  • C. Find slot
  • D. Squeeze in

Answer: C


NEW QUESTION # 67
What could be the reason for multiple commitment of invidula capacities, where several operations have the same scheduled dates on a work center (or resource) after planing?

  • A. The Change Planning Direction indicator is set in strategy profile.
  • B. The finite Scheduling indicator is NOT set in the strategy profile.
  • C. The work center has several invidula capacities.
  • D. Alternative work centers are fully occupied.

Answer: B,C


NEW QUESTION # 68
What does a line hierarchy in repetitive manufacturing represent?

  • A. A production line with more than one work center
  • B. A production line with prioritized alternative work centers
  • C. A production line with a parallel sequence in the routing
  • D. A production line with an alternative sequence in the routing

Answer: A


NEW QUESTION # 69
Advanced Planning uses master data and transaction data from SAP S/4HANA. In which data objects can you set the advanced planning flag?

  • A. Material
  • B. Work center
  • C. Plant
  • D. Production version

Answer: A,B


NEW QUESTION # 70
......


SAP C-TS422-2021 Certification Exam is a valuable credential for professionals who work in production planning and manufacturing. SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing 2021 certification demonstrates that the individual has the knowledge and skills necessary to design, configure, and implement SAP S/4HANA Production Planning and Manufacturing solutions. It also shows that the individual is committed to staying up-to-date with the latest industry standards and best practices.

 

Use SAP C_TS422_2021 Dumps To Succeed Instantly in C_TS422_2021 Exam: https://whizlabs.actual4dump.com/SAP/C_TS422_2021-actualtests-dumps.html